COMMERCIAL AIR CONDITIONING · SYDNEYRepairs · Installations · Service · Maintenance

COMMERCIAL & INDUSTRIAL EXPERIENCE

Commercial HVAC Projects & Fit-Outs Sydney

From commercial fit-outs
to central plant upgrades.

Commercial HVAC, mechanical, electrical and commissioning projects across education, offices, hospitality, government and industrial facilities.

Commercial rooftop air handling plant and pipework overlooking Sydney Harbour
Commercial HVAC plant & building services

COMMERCIAL FIT-OUT WORKS

Building services for
your next fit-out.

From tenant retail spaces to office and hospitality premises, discuss the complete mechanical and electrical scope for your fit-out, refurbishment or building upgrade.

01

Air conditioning

VRV, VRF and multi-head split systems, tenancy installations, equipment replacements and connections to existing building plant.

02

Mechanical ventilation

Fresh air supply, exhaust systems, ductwork, industrial fans and car park ventilation systems.

03

Electrical & switchboards

Mechanical services switchboards, power distribution, control wiring and fire trip connections.

04

Central plant & water systems

Chillers, cooling towers, chilled water and condenser water piping, pumps and control valves.

05

Controls & operation

Economy cycle upgrades, variable speed drives and mechanical plant control systems.

06

Commissioning & ongoing care

Engineering commissioning, air balancing, servicing, repairs and maintenance contracts.

SELECTED CUSTOMER & PROJECT WORKS

Commercial air conditioning and ventilation project experience.

A snapshot of the key work completed for each customer, from selected installations to whole-building commissioning and plant upgrades.

Australian Catholic University campus buildings in North Sydney

Australian Catholic University

North Sydney campus buildings

Commercial fit-out air conditioning design and construction, central plant and cooling tower upgrades, electrical installations, maintenance and repairs.

Read the project scope

Campus air conditioning and fit-out works

Ramtech carried out air conditioning design, construction and installation works across Australian Catholic University campus buildings in North Sydney. The scope included multi-head split systems, including Daikin equipment, together with commercial fit-out air conditioning works.

Central plant, ventilation and electrical systems

The campus works also covered central plant and cooling tower upgrades, mechanical ventilation installations and associated electrical upgrades. Mechanical services switchboard installations formed part of the building services scope.

Plant maintenance and repairs

Maintenance and repair work extended to chillers, packaged units, air handling units, condenser water pumps and chilled water pumps. Equipment covered included Temperzone packaged units and Daikin, Mitsubishi Electric and ActronAir systems.

Work included

  • Multi-head split system installations for various campus buildings, including Daikin systems.
  • Design and construction of air conditioning systems and complete installation of central plant upgrades.
  • Cooling tower upgrades, mechanical ventilation installations and associated electrical upgrades.
  • Mechanical services switchboard (MSSB) installations.
  • Maintenance and repairs to chillers, packaged units, air handling units, condenser water pumps and chilled water pumps.
  • Work on Temperzone packaged units and Daikin, Mitsubishi Electric and ActronAir equipment.
  • Commercial fit-out air conditioning works.
SAS Institute building surrounded by trees

SAS Institute

Commercial office facility

Daikin McQuay chiller installation, plant upgrades, water piping and pumps, economy cycle, switchboards, controls and maintenance contracts.

Read the project scope

Central HVAC plant upgrade

Ramtech provided design and construction services for upgrades to the existing central HVAC plant at the SAS Institute office facility. The scope brought together chiller installation, water circulation systems, ventilation operation and mechanical services power and controls.

Chiller, pumps and economy cycle

Works included installation of a Daikin McQuay chiller, chilled water piping and chilled water controls. Chilled water and condenser water pump installations included variable speed drives. Economy cycle upgrades incorporated mechanical louvres as part of the plant upgrade.

Switchboards, controls and ongoing maintenance

The electrical scope covered MSSB power and control system design, installation and upgrades, including fire trip connections to mechanical services switchboards throughout the building. Maintenance contracts also covered the building’s air conditioning and central plant systems.

Work included

  • Daikin McQuay chiller installation and chilled water piping, including chilled water controls.
  • Chilled water and condenser water pump installations, including variable speed drives.
  • Economy cycle upgrades, including mechanical louvres.
  • Design, installation and upgrade of MSSB power and control systems.
  • Fire trip connections to mechanical services switchboards throughout the building.
  • Maintenance contracts for the building’s air conditioning and central plant systems.
M&J Chickens industrial building exterior

M&J Chickens

Industrial food processing facility

Complete industrial ventilation design and construction, positive-pressure fresh air, car park exhausts, industrial fans and electrical power and control switchboards.

Read the project scope

Industrial ventilation design and construction

Ramtech designed and constructed mechanical ventilation systems for the M&J Chickens industrial food processing facility. The work covered ventilation throughout the building, including processing areas and car park exhaust systems.

Fresh air, exhaust and air handling

The mechanical scope included fresh air supply to provide positive pressure in food processing areas, industrial fan installations and exhaust ventilation systems. Air handling unit installation and maintenance also formed part of the recorded works.

Electrical power and control systems

Associated electrical work included switchboard design, fabrication, installation and commissioning for ventilation power and controls. The project combined mechanical equipment installations with the electrical systems needed to operate the ventilation plant.

Work included

  • Mechanical ventilation systems for industrial processing areas and car park exhausts.
  • Fresh air supply to provide positive pressure in food processing areas.
  • Industrial fan installations and exhaust ventilation systems.
  • Electrical switchboard design, fabrication, installation and commissioning for power and control systems.
  • Air handling unit installations and maintenance.
Commercial office building supplied for the Mirvac project

Mirvac

Multi-storey & commercial office buildings

Cooling tower and central HVAC plant upgrades, control valves, pumps, fans, electrical installations and commercial air conditioning maintenance.

Read the project scope

Commercial building central plant works

Ramtech carried out central HVAC plant upgrade, electrical and maintenance works for Mirvac multi-storey and commercial office properties. The scope focused on the plant and supporting components serving building air conditioning systems.

Cooling towers and mechanical components

Recorded works included cooling tower upgrades and central HVAC plant upgrades, together with work on associated control valves, pumps and fans. These elements formed the mechanical plant scope rather than a standalone room air conditioning installation.

Electrical installations and maintenance

Electrical installations for mechanical plant were included alongside maintenance of commercial air conditioning systems. The works therefore covered both plant upgrades and ongoing attention to existing building services equipment.

Work included

  • Cooling tower upgrades and central HVAC plant upgrades.
  • Control valves, pumps and fans associated with building air conditioning systems.
  • Electrical installations for mechanical plant.
  • Maintenance of commercial air conditioning systems.
Exterior of the Family Law Courts building

Family Law Courts of Australia

Court building

Whole-building HVAC commissioning, controls and air balancing, with selected ventilation, VAV, ductwork and stair pressurisation installations.

Read the project scope

Whole-building HVAC commissioning

Ramtech provided HVAC commissioning engineering and control system commissioning services for the Family Law Courts of Australia building. The scope included whole-building air balancing and mechanical engineering commissioning.

Selected mechanical installations

Installation works covered selected ventilation fans, mechanical ductwork and variable air volume equipment. Stair pressurisation installations were also included in the recorded project scope.

Commissioning and installation scope

The whole-building element related to commissioning, controls and air balancing. Physical installation works were selected elements of the mechanical systems, bringing together ventilation, VAV equipment, ductwork and stair pressurisation services.

Work included

  • Whole-building HVAC commissioning engineering and control system commissioning services.
  • Air balancing and mechanical engineering commissioning.
  • Selected mechanical ventilation fans, ductwork and variable air volume (VAV) installations.
  • Stair pressurisation installations.

ICI Pharmaceuticals

Pharmaceutical manufacturing plant

Chilled water, hot water and pressure relief control systems for pharmaceutical manufacturing environments.

Read the project scope

Pharmaceutical manufacturing control systems

Ramtech carried out control system works for chilled water and hot water systems serving the ICI Pharmaceuticals manufacturing environment. The project scope concerned controls associated with the plant’s production services.

Chilled water and hot water controls

The recorded work included chilled water control systems for manufacturing plant and hot water control systems for pharmaceutical production areas. These works formed the water-system controls component of the project.

Pressure relief controls

Pressure relief control systems associated with the manufacturing environment were also included. Together, the chilled water, hot water and pressure relief controls made up the recorded scope for this pharmaceutical facility.

Work included

  • Chilled water control systems for manufacturing plant.
  • Hot water control systems for pharmaceutical production environments.
  • Pressure relief control systems associated with the manufacturing environment.
Bondi Icebergs Club and ocean pool

Bondi Icebergs

Bondi

Exhaust fan installations and selected mechanical ventilation ductwork as part of facility upgrade works.

Read the project scope

Exhaust ventilation upgrade works

Ramtech carried out exhaust ventilation works as part of upgrade works at Bondi Icebergs. The job involved exhaust fan installations and selected mechanical ventilation ductwork at the Bondi facility.

Fan and ductwork installation

The recorded installation scope covered exhaust fans and partial installation of mechanical ventilation ductwork. The ductwork component was a selected portion of the ventilation works, rather than a complete replacement of every ventilation system in the facility.

Work included

  • Installation of exhaust fans as part of upgrade works.
  • Partial installation of mechanical ventilation ductwork.
Doyles restaurant on the waterfront at Watsons Bay

Doyles Restaurant

Watsons Bay

Mechanical ventilation and exhaust fan upgrades, including associated electrical installations for the waterfront restaurant.

Read the project scope

Restaurant mechanical ventilation works

Ramtech carried out mechanical ventilation installation and upgrade works for Doyles Restaurant at Watsons Bay. The project combined ventilation equipment works with associated electrical installations for the waterfront restaurant.

Exhaust fan upgrades

Exhaust fan upgrades formed a specific part of the scope, alongside the mechanical ventilation installation work. The job addressed the restaurant’s ventilation equipment and the electrical works associated with those upgrades.

Work included

  • Mechanical ventilation installations and upgrades.
  • Exhaust fan upgrades.
  • Associated electrical works.
Sheraton on the Park hotel entrance in Sydney

Sheraton on the Park

Sydney · Multiplex project works

Air conditioning installations, condenser water packaged fan coil units and air balancing for tenant retail fit-outs, including Multiplex project works.

Read the project scope

Retail tenancy air conditioning fit-out

Ramtech carried out commercial fit-out air conditioning works for tenant retail spaces at Sheraton on the Park in Sydney, including Multiplex project works. The scope related specifically to retail tenancy air conditioning within the hotel property.

Packaged fan coil unit installations

Installation work included condenser water packaged fan coil units for the tenant retail spaces. These units formed the air conditioning equipment component of the tenancy fit-out works.

Air balancing services

Air balancing services were included in association with the air conditioning installations. The recorded job therefore combined equipment installation and air balancing for the retail fit-out areas.

Work included

  • Installation of condenser water packaged fan coil units for tenant retail spaces.
  • Air balancing services associated with air conditioning works.
Northpoint Tower in North Sydney viewed from street level

Northpoint Tower

North Sydney

Design, construction and installation of stair pressurisation fan system upgrades for the North Sydney tower.

Read the project scope

Stair pressurisation system upgrade

Ramtech provided design and construction services for upgrades to the stair pressurisation system at Northpoint Tower in North Sydney. The project focused on the tower’s stair pressurisation fan system.

Fan installation works

The installation scope included stair pressurisation fans as part of the system upgrade. Design, construction and fan installation were the recorded components of this commercial high-rise project.

Work included

  • Design and construction of stair pressurisation upgrades.
  • Installation of stair pressurisation fans.
UNSW Sydney campus buildings and pedestrian walkway

UNSW Sydney

University of New South Wales · Sydney

Installation of commercial kitchen exhaust fans and associated kitchen ventilation equipment.

Read the project scope

Commercial kitchen exhaust fan installation and mechanical ventilation upgrades

Ramtech carried out commercial kitchen exhaust fan installation and associated mechanical ventilation works at UNSW Sydney. The job extended from the initial site assessment and engineered equipment selection through to installation, motor-drive alignment, final commissioning and handover.

On-site assessment and engineered equipment selection

The UNSW Sydney works began with an on-site assessment of the existing commercial kitchen exhaust and associated mechanical ventilation equipment. This assessment informed the engineered selection of plant, fan assemblies and motors for the proposed installation and upgrade works.

Design, construction and operational planning

Ramtech provided design and construct services for the ventilation works, bringing together equipment selection, installation planning and site preparation. Operational planning addressed the sequence of work, site access and the practical requirements for handling and installing large mechanical ventilation equipment.

Site preparation, lifting and installation

Site works included preparation of the work areas, safe work practices, and the lifting and hoisting of equipment, including fan assemblies and motors. The installation scope covered large commercial kitchen exhaust fans and associated kitchen ventilation equipment, together with upgrades to existing fan motors.

Motor-drive alignment and commissioning

Specialised alignment of motor drives formed part of the installation and commissioning works. This was followed by final commissioning of the installed and upgraded ventilation equipment before project handover.

Project handover

The project combined assessment, engineered plant selection, design and construction, site operations, equipment installation, motor upgrades and commissioning within one coordinated scope. Final commissioning services and handover completed the works for UNSW Sydney.

Work included

  • On-site assessment before works commenced.
  • Engineered selection of mechanical ventilation plant and equipment.
  • Design and construct services for commercial kitchen exhaust and associated ventilation works.
  • Operational planning, safe work practices and site preparation.
  • Lifting and hoisting of fan assemblies, motors and associated site equipment.
  • Installation of large commercial kitchen exhaust fans and associated ventilation equipment.
  • Upgrades to existing fan motors.
  • Specialised alignment and commissioning of motor drives.
  • Final commissioning services and project handover.
Interior of a University of Sydney hall

The University of Sydney

Sydney

Commercial kitchen exhaust system installation and upgrades, including fans, associated ductwork and electrical works.

Read the project scope

Commercial kitchen exhaust works

Ramtech carried out commercial kitchen mechanical ventilation works for the University of Sydney. The project included installation of kitchen exhaust systems and upgrades to associated exhaust equipment.

Fans, ductwork and electrical installations

The scope covered exhaust fan upgrades, associated mechanical ductwork and electrical works. These components formed the kitchen exhaust installation and upgrade package for the university project.

Work included

  • Installation of commercial kitchen exhaust systems.
  • Exhaust fan upgrades and associated ductwork.
  • Associated electrical works.
Western Sydney University campus building

Western Sydney University

Western Sydney University

Supply and installation of Daikin air conditioning systems, including commercial fit-out works for air conditioning.

Read the project scope

Daikin air conditioning supply and installation

Ramtech supplied and installed Daikin air conditioning systems for Western Sydney University. The recorded scope included both equipment supply and the installation works associated with the university’s air conditioning project.

Commercial fit-out air conditioning

Commercial fit-out works for air conditioning were included alongside the Daikin system installations. The project combined the installation of air conditioning equipment with the air conditioning component of the commercial fit-out.

Work included

  • Supply of Daikin air conditioning systems.
  • Installation of Daikin air conditioning systems.
  • Commercial fit-out works for air conditioning.
Blue Mountains Grammar School campus and grounds

Blue Mountains Grammar School

Blue Mountains

Manufacture, supply and installation of data centre air conditioning, with integrated server cooling, three-tier redundancy and complete room fit-out.

In-row rack, room and server rack cooling using an integrated patented design by Ramtech, with three-tier air conditioning redundancy and a reported 21% power consumption saving. Includes all electrical and building works, ceiling installation, glazing, lighting and general data room fit-out.

Read the project scope

Integrated data centre cooling

Ramtech manufactured, supplied and installed data centre air conditioning for the server facilities at Blue Mountains Grammar School. The cooling scope incorporated in-row rack cooling, room cooling and server rack cooling within an integrated Ramtech-designed system.

Redundancy and reported energy performance

The project information identifies an integrated patented Ramtech design with three-tier air conditioning redundancy. A 21% energy input saving in power consumption was reported in the supplied project information; this is a project-specific reported figure.

Complete data room fit-out

The works extended beyond cooling equipment to associated electrical and building works. Ceiling installation, glazing, lighting and general data room fit-out were included, bringing the server cooling installation and supporting room works together within the project scope.

Work included

  • Manufacture, supply and installation of data centre cooling systems for servers.
  • In-row rack cooling, room cooling and server rack cooling.
  • Integrated patented system designed by Ramtech, with three-tier air conditioning redundancy.
  • Reported 21% energy input saving in power consumption, as supplied by the project owner.
  • All associated electrical and building works.
  • Ceiling installation, glazing, lighting and general data room fit-out.
St Augustine’s College campus in Brookvale

St Augustine’s College

Brookvale

Mechanical ventilation upgrades, electrical control system installation, and commercial kitchen exhaust fan and ducting upgrades.

Read the project scope

Mechanical ventilation upgrade at Brookvale

Ramtech carried out mechanical ventilation system upgrades at St Augustine’s College in Brookvale. The project included commercial kitchen exhaust equipment and the associated ventilation ducting.

Kitchen exhaust and electrical controls

Works covered upgrades to commercial kitchen exhaust fans and ducting, together with installation of an electrical control system. The recorded scope combined mechanical ventilation equipment upgrades with the controls associated with the installation.

Work included

  • Mechanical ventilation system upgrade.
  • Electrical control system installation.
  • Commercial kitchen exhaust fan and ducting upgrades.
Sage Hotel Wollongong and surrounding coastal precinct at sunset

Sage Hotel Wollongong

Wollongong

HVAC installation services and rooftop ventilation upgrades, including fresh air supply, exhaust systems, electrical wiring and controls.

Read the project scope

Hotel HVAC and rooftop plant works

Ramtech provided HVAC installation services and rooftop main plant mechanical ventilation upgrades at Sage Hotel Wollongong. The project included a full upgrade of the rooftop main plant ventilation systems within the recorded scope.

Fresh air and exhaust systems

Fresh air supply and exhaust system upgrades formed the mechanical ventilation component of the job. These works covered both the supply and exhaust sides of the rooftop ventilation installation.

Electrical wiring and controls

Associated electrical wiring and control system upgrades were included alongside the HVAC and ventilation works. The scope brought together rooftop mechanical equipment, electrical wiring and operational controls.

Work included

  • HVAC installation services.
  • Full upgrade of rooftop main plant mechanical ventilation systems.
  • Fresh air supply and exhaust system upgrades.
  • Electrical wiring and control system upgrades.
Tea Gardens Cafe outdoor courtyard and building

Woollahra Council

Tea Gardens Cafe

Mechanical ventilation system upgrades and associated works to meet ventilation compliance requirements at Tea Gardens Cafe.

Read the project scope

Tea Gardens Cafe ventilation upgrade

Ramtech carried out mechanical ventilation system upgrade works at Tea Gardens Cafe for Woollahra Council. The job focused on the cafe’s mechanical ventilation systems and associated ventilation works.

Associated compliance works

The recorded scope included associated ventilation works to meet ventilation compliance requirements. The project description covers the system upgrades and related works without extending the scope to unrelated building services.

Work included

  • Upgrade of mechanical ventilation systems at Tea Gardens Cafe.
  • Associated ventilation works to meet compliance requirements.
Stainless steel commercial kitchen exhaust hood at Avalon Bowling Club

Avalon Bowling Club

Avalon Beach

Stainless steel hood design, manufacture, supply and installation, including mechanical ventilation ducting installation and fan upgrades.

Read the project scope

Stainless steel kitchen hood design and manufacture

Ramtech provided design, manufacture, supply and installation of a stainless steel commercial kitchen hood for Avalon Bowling Club at Avalon Beach. The hood formed the central element of the kitchen ventilation project.

Ducting installation and fan upgrades

Site works included installation of mechanical ventilation ducting and upgrades to ventilation fans. The scope therefore linked the manufactured kitchen hood with its associated ducting and fan works.

Design and construction scope

The project combined fabrication and supply of the stainless steel hood with installation on site. Mechanical ventilation ducting and fan upgrades were included within the same recorded design and construction scope.

Work included

  • Stainless steel kitchen hood design, manufacture, supply and installation.
  • Installation of mechanical ventilation ducting.
  • Mechanical ventilation fan upgrades.
Bilgola Surf Life Saving Club building viewed from above

Bilgola Surf Life Saving Club

Bilgola Beach

Commercial kitchen system upgrades, including mechanical ventilation ducting, associated electrical works and commercial exhaust fan upgrades.

Read the project scope

Commercial kitchen ventilation upgrade

Ramtech carried out commercial kitchen system upgrades at Bilgola Surf Life Saving Club at Bilgola Beach. The work focused on the kitchen ventilation installation and its associated electrical services.

Ducting, exhaust fans and electrical works

The scope included mechanical ventilation ducting upgrades, commercial exhaust fan upgrades and associated electrical works. These components formed the mechanical and electrical elements of the club’s commercial kitchen upgrade.

Work included

  • Commercial kitchen system upgrades.
  • Mechanical ventilation ducting upgrades.
  • Associated electrical works and commercial exhaust fan upgrades.
Baldwin Living Seabeach Gardens buildings and grounds

Baldwin Living Seabeach Gardens – Aged Care

Lane Cove · Aged care

HVAC and mechanical services switchboard (MSSB) installations, plus commercial kitchen stainless steel rangehood and ducting upgrades.

Read the project scope

Aged care HVAC installations

Ramtech carried out HVAC installations for Baldwin Living Seabeach Gardens – Aged Care at Lane Cove. The recorded works also included electrical mechanical services switchboard installations and commercial kitchen ventilation upgrades.

Mechanical services switchboards

Mechanical services switchboard (MSSB) installations formed the electrical component of the scope. These works were included alongside the HVAC installation services for the aged care project.

Stainless steel rangehood and ducting

The commercial kitchen scope included an upgrade to the stainless steel rangehood and associated ducting. The project combined air conditioning, mechanical services electrical installations and kitchen ventilation works.

Work included

  • HVAC installations.
  • Electrical mechanical services switchboard (MSSB) installations.
  • Commercial kitchen stainless steel rangehood upgrade, including ducting.
Factory and warehouse complex viewed from above
Industrial warehouse building in Minto

Factory – Industrial – Warehouses

Minto

Ducted and split system HVAC installations, including mechanical ventilation exhaust fans.

Read the project scope

Industrial air conditioning installations at Minto

Ramtech carried out HVAC installation works for factory, industrial and warehouse premises at Minto. The scope included ducted air conditioning systems and split system air conditioning installations.

Mechanical exhaust ventilation

Mechanical ventilation exhaust fan installations were also included in the recorded works. The project combined air conditioning installations with exhaust ventilation equipment for the industrial and warehouse setting.

Work included

  • Ducted HVAC system installations.
  • Split system air conditioning installations.
  • Mechanical ventilation exhaust fans.
8 Berry Street building in North Sydney

8 Berry Street

North Sydney

Whole-building standalone packaged air conditioning upgrades, new mechanical services switchboards on every level, controls, air balancing and commissioning.

Read the project scope

Whole-building packaged air conditioning upgrade

Ramtech upgraded standalone packaged air conditioning units throughout 8 Berry Street in North Sydney. The scope covered the building as a whole, including mechanical services electrical installations and a new air conditioning control system.

Switchboards and building controls

New mechanical services switchboards were installed on all levels. A new air conditioning control system was also installed for the whole building as part of the upgrade works.

Air balancing and commissioning

Whole-building air balancing and commissioning services completed the recorded scope. The job brought together packaged equipment upgrades, switchboard installations, building-wide controls and commissioning services.

Work included

  • Upgrade of standalone packaged air conditioning units throughout the whole building.
  • Installation of new mechanical services switchboards (MSSBs) on all levels.
  • Installation of a new air conditioning control system for the whole building.
  • Whole-building air balancing and commissioning services.
TPG Telecom signage on the exterior of a glass-fronted commercial building

TPG

Commercial offices, retail shops and pubs

Mechanical engineering design, Daikin commercial air conditioning installations, ducted split-system and air-cooled air conditioning, packaged unit upgrades, and mechanical services switchboard (MSSB) design, construction and installation.

Works include mechanical design drawings for ducting installation, commercial ductwork, breakdown repairs, electrical wiring installations and repairs, and mechanical engineering commissioning. HVAC audits and site assessments cover commercial offices, retail shops and pubs.

Read the project scope

Daikin air conditioning, mechanical design and electrical upgrades

Project brief

The recorded TPG scope covers mechanical engineering design and commercial air conditioning works for offices, retail shops and pubs. It includes installation of Daikin commercial air conditioning systems, ducted split-system and air-cooled air conditioning, equipment repairs and packaged unit upgrades.

Ductwork design and installation

Work includes mechanical design drawings for ducting installation and commercial ductwork installations. HVAC audits and site assessments form part of the recorded scope for identifying air conditioning requirements at the premises.

Electrical work, switchboards and commissioning

The scope includes mechanical services switchboard (MSSB) design, construction and installation, electrical wiring installations and repairs, and mechanical engineering commissioning. Air conditioning breakdown repairs are also included in the recorded work.

Planning a similar project?

Provide the site location, building use, equipment list and available mechanical or electrical drawings. Identify whether the enquiry concerns Daikin equipment installation, ductwork, a breakdown, switchboard work so the proposed scope can be defined.

Related services: Mechanical Engineering Design & Construct · Air conditioning repairs · Air conditioning installations.

PLAN YOUR NEXT PROJECT

A fit-out, an upgrade
or a new installation?

Share your site, equipment and project requirements. We can discuss the air conditioning, ventilation, electrical and commissioning work your building needs.

LET’S TALK ABOUT YOUR BUILDING

Better comfort starts
with a conversation.

Tell us what your air conditioning needs. A repair, a new installation, a service visit or a maintenance plan—we’ll help you discuss the next step.

FREE CALL1300 885 668

RAMTECH COMMERCIAL AIR
Commercial HVAC project experience across education, hospitality, offices, industrial premises and aged care. Explore the recorded work scopes.

For an existing fault, include the equipment type, any error code and the spaces affected. For new work, tell us about your premises and project requirements.

Request a service or quote

First name, surname, phone, email, site location and message are required. We use your details to respond to your enquiry. Privacy information.