BEFORE YOU ENQUIRE
Office fit-outs questions
Can existing air conditioning be reused?
Potentially. Suitability depends on capacity, condition, zoning and the revised layout. A system that served an open office may need alterations when enclosed rooms are introduced.
Do you handle electrical and control work?
Associated mechanical electrical works, control systems and switchboards can be included in the agreed scope. The connection to base-building systems should be coordinated with the building manager.
Can work be staged around an operating office?
Access constraints and occupied areas can be considered when scoping the work. Provide your operating hours and programme so staging and availability can be discussed.
Is commissioning included?
Air balancing and commissioning can form part of the installation scope. The proposal should identify the checks, records and handover deliverables included.
Can new meeting rooms affect an existing office air conditioning system?
Yes. Partitions can change airflow paths, occupancy and the areas served by existing outlets and controls. Provide the proposed layout and existing mechanical drawings so ductwork, return air, ventilation and control requirements can be considered together.
What should a builder provide for a tenancy fit-out quotation?
Provide the tenancy address, floor plan, proposed room uses, ceiling layout, occupancy, programme and available mechanical drawings. Identify landlord requirements and whether design, electrical connections, controls, balancing and commissioning are to be included.